Results of Design Public Advertisement

A A
  • Extension construction of “Children’s Hospital” Project Evaluation Result

    Evaluation ResultUrban admin 1641
  • ○ Outcome of Design Evaluation

    ✓Project Outline
    Project Name Extension construction of “Children’s Hospital” Project
    Ordering Institution Architecture Division, Construction Bureau, Office of Infrastructure Management, Seoul Metropolitan Government (+82-2-3708-2617, infra@seoul.go.kr)
    Land Location 260, Heolleung-ro, Seocho-gu, Seoul
    Land Area 31,804.4㎡ Architecture Size B2/5F, Floor area (24,893㎡)
    Design Cost 1,124,000 (Unit: ₩1,000)
    ✓Outline to Design Entry
    Entry Method Common Public Entry
    Entry State Entry application : 44case, Accepted entry: 14case
    ✓Ways of Evaluation
    Date 14:00~18:00 (Fri), 2014. 4.18.
    Judges
    Name (Occupation) Kim Yong Sup (Sungkyunkwan University)
    Han Hyung U (Hoseo University)
    Hyu Seo Gu (Wondosi Architect Office)
    I Chung Gi (University of Seoul)
    Kang Mi Sun (Ewha Women University)
    Observer
    Name (Occupation) O Jung Yn (Representative of community residents)
    Kim Suk Thae (Children’s Hospital)
    ✓Evaluation Outcome
    Distinction Architectural Office Architect (Designer) Prize
    Selected Work A Tec Architect Office Kim Sang Gil Right of Contract
    Aerial View, etc    당선작
    Judge for Prized Work Good rationality, system etc
    Distinction Architectural Office Architect (Designer) Prize
    Excellence Prize Dirim Architect Office Kim Sun Hyun 4,000 (Unit: ₩1,000)
    Aerial View, etc    우수작
    Distinction Architectural Office Architect (Designer) Prize
    Runner-up Um&I Architect Office I Gwan Pyo 3,000 (Unit: ₩1,000)
    Aerial View, etc    가작1

View Comments (0)

Comments

0 / 300